Sign up & get discount coupon

Long Lead 5M

$28.20$31.70

Long Lead Mini (5 metre) 12mm wide,  5 Meters long, Small Snap Hook.

Long Lead Regular (5 metre) 19mm wide,  5 Meters long, Medium Snap Hook.

 

Is this the right lead for you, watch our video

Delivery period: 3 day(s)

Clear

Long Lead Mini (5 metre) 12mm wide,  5 Meters long, Small Snap Hook.

Long Lead Regular (5 metre) 19mm wide,  5 Meters long, Medium Snap Hook.

For training dogs on Recall, or allowing dogs a roam in the park, or the beach, while still maintaining lead control.
Folds neatly to hang conveniently from belt loop when not in use.

Weight 0.2 kg
Size

Regular, Mini

Colour

Apple Green, Black, Blue, Purple, Red

Video